Mebane, NC - Restoration of a 19’ transom and a new 3’ panel - Delivered 10/2022
Before restoration. GRS sourced the tiles needed for the small transom over the upstairs entrance.
Close-up of before restoration
Bill and his team doing the last prep work before they start the installation
A good look at the beautiful tin ceiling
Great looking wood floors
Two of the four sections in place
Third section being installed
Last section of the large transom going up
Home stretch for the large transom
After installation of the small transom above the upstairs entrance.
After both transoms were installed
